{"id":43,"date":"2017-04-12T05:14:27","date_gmt":"2017-04-12T05:14:27","guid":{"rendered":"https:\/\/www.h2oengineering.co.nz\/?p=43"},"modified":"2017-04-17T03:47:19","modified_gmt":"2017-04-17T03:47:19","slug":"pure-water-treatment","status":"publish","type":"post","link":"https:\/\/h2oengineering.co.nz\/index.php\/2017\/04\/12\/pure-water-treatment\/","title":{"rendered":"Pure Water Treatment"},"content":{"rendered":"<p>We have maintained and improved several industrial water treatment plants with clients who are required to meet trade waste consent limits for their facilities along with construction sites who are discharging contaminated construction site run off.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We have maintained and improved several industrial water treatment plants with clients who are required to meet trade waste consent limits for their facilities along with construction sites who are discharging contaminated construction site run off.<\/p>\n","protected":false},"author":1,"featured_media":31,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-43","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-home-slider"],"_links":{"self":[{"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/posts\/43","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/comments?post=43"}],"version-history":[{"count":0,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/posts\/43\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/media\/31"}],"wp:attachment":[{"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/media?parent=43"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/categories?post=43"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/h2oengineering.co.nz\/index.php\/wp-json\/wp\/v2\/tags?post=43"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}